Client

Distribuţie Energie Oltenia

Sector
Total amount

88.540.989,25 RON

Grant amount

61.508.265,24 RON

Implementation of an Advanced Distribution Management System (ADMS) and monitoring and optimization of energy consumption in a homogeneous area of predominantly residential electricity consumers, located in the vicinity of the Piteşti municipal power plant in Argeş County.

Smart energy distribution for a more efficient future.

Project description:

Implementation of a smart electricity metering system for 10,059 residential and small non-residential consumers in a homogeneous area of Argeș County, with the aim of reducing average household energy consumption. The project proposes:

  • an increase of 16,197 in the number of users connected to smart energy networks through the installation and grid connection of 16,197 smart meters;

    improving the quality of the electricity distribution services provided by DELGAZ GRID S.A. through the implementation of an advanced distribution management system (ADMS);

    Modernization of the 110/20 kV, 2×25 MVA Prundu substation to ensure optimal operating conditions for smart metering systems.

Services offered:

  • assistance during the project evaluation and contracting phase;

  • risk management plan;

 

  • identifying and planning the procurement procedures necessary for the project's implementation;

  • presentation of the project management team, communication management plan with the contracting authority and other stakeholders, supporting documents.